[1]
“A Comparative Study On Three Hyper-Heuristic Approaches For Solving Benchmark Scheduling Problems”, Sindh. Uni. Res. J. SS, vol. 43, no. 2, Dec. 2011, doi: 10.26692/surj-ss.v43i2.6055.